HPE ProLiant DL160 Gen10 Maintenance And Service Manual page 42

Hide thumbs Also See for ProLiant DL160 Gen10:
Table of Contents

Advertisement

Removing the secondary PCI riser cage
Removing the secondary PCI riser cage
Procedure
Procedure
1. Observe the following alerts:
CAUTION: To prevent damage to the server or expansion boards, power down the server and remove all AC power
CAUTION:
cords before removing or installing the PCI riser cage.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated
CAUTION:
with either a component or a blank.
2. Back up all server data.
3. If installed, remove the bezel.
4. Power down the server.
5. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
6. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
7. Remove the access panel .
8. Do one of the following:
Remove the primary PCI riser blank.
Remove the primary PCI riser cage.
HPE ProLiant DL160 Gen10 Server Maintenance and Service Guide
42

Advertisement

Table of Contents
loading

Table of Contents