Removing and replacing the LFF front I/O assembly
Removing and replacing the LFF front I/O assembly
Removing and replacing the SFF front I/O assembly
Removing and replacing the SFF front I/O assembly
Removing and replacing the LFF front I/O assembly
Removing and replacing the LFF front I/O assembly
Prerequisites
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
T-15 Torx screwdriver
About this task
About this task
CAUTION:
CAUTION:
A discharge of static electricity from a finger or other conductor might damage system boards or other static-sensitive
devices. To prevent damage, observe antistatic precautions.
Procedure
Procedure
1. Back up all server data.
2. If installed, remove the front bezel .
3. Power down the server.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Disconnect all peripheral cables from the server.
6. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
7. Remove the access panel .
8. Disconnect all following cables from the system board:
Front I/O and ambient temperature sensor cable
USB 3.0 cable
iLO service port cable
9. Remove the front I/O assembly, do the following:
a. Remove the front I/O screw (callout 1).
b. Remove the front I/O and ambient temperature sensor cable (callout 2).
Retain the screw for future use.
HPE ProLiant DL160 Gen10 Server Maintenance and Service Guide
79