GE LOGIQ P9 Service Manual page 279

Hide thumbs Also See for LOGIQ P9:
Table of Contents

Advertisement

GEDRAFT
D
5604324, R
IRECTION
EVISION
To configure automatic data transfers:
1.) Navigate to ADMIN > System Admin.
2.) On System Admin, configure these settings:
-
-
-
3.) Click Save.
4.) Navigate to Utility (second page) > Service > Utilities > Data Transfer.
5.) On Data Transfer, select Scheduler, and then select the days to perform the data transfer.
6.) Click Save Settings.
7.) To manually perform a data transfer, click Send All.
For more information:
Utilities on page 5-73
11
DRAFT (J
Transfer Machine Logs to GE – Default is checked
Transfer Operator Information to GE
Transfer Images (captured without patient information) to GE – Default is checked.
Chapter 5 - Components and Functions (Theory)
24, 2019)
ANUARY
LOGIQ P9/P7
S
M
ERVICE
ANUAL
5-95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p7

Table of Contents