GE LOGIQ P9 Service Manual page 524

Hide thumbs Also See for LOGIQ P9:
Table of Contents

Advertisement

GERAFT
D
5604324, R
IRECTION
EVISION
Section 8-50
Replacement of LOGIQ P9 ROTATION MODULE KIT
8-50-1
Manpower
1 person, 30 minutes
8-50-2
Tools
Standard Phillips Screwdriver, Nipper, Torque wrench: Needed HEX wrench - 4mm HEX wrench (For
M5 HEX Screw), Needed force - 60 Kgf·cm (For screw tighten force), Monkey Spanner (For NUT M4),
Hot air blower or Electric hair dryer
8-50-3
Removal Procedure
1) Remove the Monitor, Monitor Arm and OPIO Assy.
2.) Unlock cable clamp and carefully pull down 3 cables.
3.) Unscrew 1 screw and remove the cable clamp, and then extract out the 5 cables through the hole
of OPIO BASE.
OPIO BASE
8-198
Section 8-50 - Replacement of LOGIQ P9 ROTATION MODULE KIT
11
DRAFT (J
24, 2019)
ANUARY
LOGIQ P9/P7
S
ERVICE
5 CABLES
M
ANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Logiq p7

Table of Contents