Section 10-5
System Maintenance
10-5-1
Preliminary Checks
The preliminary checks take about 15 minutes to perform. Refer to the system user documentation
whenever necessary.
Table 10-4
Step
1
2
3
4
5
6
7
Image Archive
10-6
11
DRAFT (J
System Checks
Item
Ask & Listen
Ask the customer if they have any problems or questions about the equipment.
Fill in the top of the Ultrasound Inspection Certificate (see:
Paperwork
Note all probes and system options.
Turn the system power on and verify that all fans and peripherals turn on.
Power up
Watch the displays during power up to verify that no warning or error messages are displayed.
Probes
Verify that the system properly recognizes all probes.
Displays
Verify proper display on the LCD monitor and Touch Panel.
"Full Backup" all customer presets on Hard disk and/or DVD (see:
Presets
page
8-57).
Backup the Image Archive on DVD, USB-Stick, etc. (see:
page
8-57).
Section 10-5 - System Maintenance
24, 2019)
ANUARY
Description
LOGIQ P9/P7
S
ERVICE
page
10-35).
Settings - Backup and Restore on
see: "Settings - Backup and Restore" on
M
ANUAL