ABB GWT C9 Product Manual page 68

Table of Contents

Advertisement

4 Maintenance
4.2 Maintenance planning
Continued
Time interval
Every 2,500,000
weld strokes or
once every sixth
month
Continues on next page
68
Item
Maintenance
Ball runner
Lubricate the ball runner using (Castrol) Tribol GR 100-
2PD. Stop when the grease starts to creep out of the
ball runner.
Run the actuator back and forward three times to distrib-
ute the grease.
xx2200000324
Arm
Inspect the condition of the arms.
Retighten the bolted joints.
See
Bolt, screws, tightening torques on page
xx2200000321
Electrode hold-
Inspect the condition of the arms and electrode holders
ers
and check tightening torques of the screws.
See
Bolt, screws, tightening torques on page
xx2200000326
© Copyright 2022 ABB. All rights reserved.
118.
118.
Product manual - GWT C9
3HAA010198-001 Revision: A

Advertisement

Table of Contents
loading

Table of Contents