Maintenance Planning - ABB GWT C9 Product Manual

Table of Contents

Advertisement

4.2 Maintenance planning

General procedure
Even though the GWT C9 is designed to require few maintenance operations, it is
important to follow the maintenance time intervals and instructions to ensure a
fully functional and long living product.
xx2200000328
1
2
3
4
5
Product manual - GWT C9
3HAA010198-001 Revision: A
Note
All maintenance procedures could be performed when the welding gun is still
attached to the robot or pedestal.
Action
If the welding gun is attached to a robot, move the robot so the welding gun is posi-
tioned in a good working position.
Make sure that all safety aspects are considered before performing any maintenance.
Most maintenance operations requires that the protective cover is removed. This is
done by unscrewing the knurled screw (pos. 1) and remove the pressure washer
(pos. 2) keeping the protecting cover (pos.3) in place.
Perform the required maintenance operations.
Make sure that the working space is cleaned and that all equipment is removed before
restarting the welding.
© Copyright 2022 ABB. All rights reserved.
4 Maintenance
4.2 Maintenance planning
Continues on next page
65

Advertisement

Table of Contents
loading

Table of Contents