6.3 Decommissioning

Introduction
Read the introduction section before decommission the GWT C9 (see
on page
Required equipment
Qty
1
1
-
Procedure
1
2
3
Product manual - GWT C9
3HAA010198-001 Revision: A
111).
Equipment
Standard toolkit
Compressed air
Other equipment may be required. See
references to these in the step-by-step in-
structions in the
Repair
chapter.
Action
Purge the remaining cooling water from the water
circuit with compressed air.
Follow environmental legislation regarding recyc-
ling.
If needed; disassembly the welding gun by follow-
ing the steps described in the
© Copyright 2022 ABB. All rights reserved.
6 Storage and decommissioning
Product (example)
See
Standard toolkit on page
See
Repair on page
Note
See
Environmental information on
page
114.
See
Repair on page
Repair
chapter.
6.3 Decommissioning
Introduction
120.
75.
75.
113

Advertisement

Table of Contents
loading

Table of Contents