3 Installation and commissioning
3.1 Introduction
Continued
Precautions before start-up of the GWT C9
Required equipment
Qty
1
1
Bolts, screws and tightening torques
See
48
CAUTION
The precautions below should be observed before proceeding with start-up of
the GWT C9:
Make sure correct water flow values are defined. This to avoid damaged
welding equipment such as transformer, diodes, leaf shunts and other parts
of secondary side.
Make sure power supply corresponds to the type plate at transformer.
Make sure that the electrical power cable fulfills international safety
regulations.
Make sure the electrical circuit diagrams and flow charts, delivered with the
welding gun, have been followed during installation.
Make sure duty cycle does not exceed 40% for the primary side by calculating
Duty Cycle Rectifier. See how to calculate in the below example:
Duty Cycle Transformer = (weld time x welds/min x 100%)/ (60 s/min x
frequency) = (22 cy. x 10 welds/min x (100)) / (60 s/min x 50 hz) = 6,1%
Duty Cycle Rectifier (diodes) = (22cy. / (22cy. on + 150 cy.off)) x 100 = 12,8%
Equipment
Standard toolkit
Other tools and procedures may be re-
quired. See references to these procedures
in the step-by step instructions below.
Bolt, screws, tightening torques on page
© Copyright 2022 ABB. All rights reserved.
Product (example)
See
Standard toolkit on page
See
Special tools on page
118.
Product manual - GWT C9
3HAA010198-001 Revision: A
120.
122.

Advertisement

Table of Contents
loading

Table of Contents