ABB GWT C9 Product Manual page 105

Table of Contents

Advertisement

11
12
13
Product manual - GWT C9
3HAA010198-001 Revision: A
Action
Tip
Make a mark on the electrode holder to
remember the intersection between the
electrode holder and the arm.
Loosen the screws and nuts (pos. 1)
holding the electrode holder (pos. 2) in
place.
Gently pull out the electrode holder (pos.
2) together with the water hoses (pos. 3).
Protect the hose ends so no contamin-
ants enter.
Inspect the new arm for defects. Make
sure all contact surfaces are clean.
© Copyright 2022 ABB. All rights reserved.
5.8 Replacement of the welding gun arm
Note
xx2000002692
xx2200000287
Continues on next page
5 Repair
Continued
105

Advertisement

Table of Contents
loading

Table of Contents