ABB GWT C9 Product Manual page 58

Table of Contents

Advertisement

3 Installation and commissioning
3.3 Mechanical installation
Continued
6
7
8
9
58
Action
Attach 10 M12 (quality class 8.8)
screws and tighten them with a cor-
rect tightening torque.
Remove the lifting equipment from
the welding gun.
Remove the cover and connect all
media like Robifix, Electrical
cabling, and water supply. Replace
the cover on the gun.
th
Rotate the robots 6
axis back to
an upright positioning.
© Copyright 2022 ABB. All rights reserved.
Note
xx1900001707
See
Bolt, screws, tightening torques on page
xx1900001708
See
Lifting the GWT C9 on page 52
xx1900001709
Product manual - GWT C9
3HAA010198-001 Revision: A
118.

Advertisement

Table of Contents
loading

Table of Contents