ABB GWT C9 Product Manual page 107

Table of Contents

Advertisement

19
20
21
22
Product manual - GWT C9
3HAA010198-001 Revision: A
Action
Reassemble the arm (pos. 1) to the gun
body. If needed gently tap the arm in
place using a hammer with plastic head.
Mount two screws (pos. 2) in the diagonal
and tighten them loosely.
Align the two joining surfaces of the arm
(Pos. 1) and the arm base (pos. 2)
This is done by using a steel scale (pos.
3)
Reassemble the two remaining screws
(pos. 1) and tighten all four screws.
Use standard tightening torque according
to
Bolt, screws, tightening torques on
page
118.
Reroute the signal cable through the arm,
marked with red in illustration.
© Copyright 2022 ABB. All rights reserved.
5.8 Replacement of the welding gun arm
Note
xx2200000291
xx2200000292
xx2200000293
xx2200000294
Continues on next page
5 Repair
Continued
107

Advertisement

Table of Contents
loading

Table of Contents