ABB GWT C9 Product Manual page 86

Table of Contents

Advertisement

5 Repair
5.4 Replacement of the electrode holders and water hoses
Continued
19
20
21
22
86
Action
Tighten the screws and nuts (pos. 1) by
hand.
Align the electrode holder with the oppos-
ite electrode holder.
Tip
Use a set square (right-angled) and hold
it to the fixed arm and align the loose
electrode holder with the scale.
Note
If both electrode holders is loose or in
the wrong position, a repositioning must
be done according to the main assembly
drawing. Measure the position of the
electrode holders and make sure that it
matches the values in the main assembly
drawing. TCP check is required.
Tighten the screws and nuts alternately
to evenly distribute the force over the
clamping connection.
© Copyright 2022 ABB. All rights reserved.
Illustration
xx2000002666
xx1900000017
xx1900000019
Product manual - GWT C9
3HAA010198-001 Revision: A

Advertisement

Table of Contents
loading

Table of Contents