Fig. 37 Creep run
– Push the interleaver unit (1) into the interleaver housing until the locking bolt (2)
engages.
– Keep the button (3) pressed for the duration of the creep run.
Operating instructions Interleaver
In order to guide the newly inserted paper
up to the cutting area and to check the
paper course, the paper transport can be
initiated manually by starting the creep run.
0040
Operation
40