8.2 Creating and Running a New Experiment,
8.2.5 Run the Experiment
20202092 04/19
1. Click Run (
in Figure 31) to go to the Run tab.
C
2. Click Start Run to open the final Pre-run Check dialogue. If the
experiment needs to be saved, or if there are errors or warnings you will
be notified here.
3. When the experiment is ready, click Run. Your experiment is now
running.
NOTE: You may pause an experiment either programmatically in the
protocol or manually by clicking Pause. If paused programmatically, there
is an option to Keep well groups open during pause, otherwise flow
will be stopped while environmental control is continued during the pause.
While paused with no flow, you may unseal and reseal plate, either by
pressing the Seal button on the system or by clicking Seal or Unseal from
the Tools menu. Click Resume to resume flow and continue execution of
the protocol. A record of the pause is recorded in the run data and shown
by a dashed mark on the Dynamic Timeline.
continued
Figure 32. Pre-run
check dialogue
43 of 60
CellASIC
ONIX2 Microfluidic System
®
Need help?
Do you have a question about the Millipore CellASIC ONIX2 and is the answer not in the manual?
Questions and answers