Electrical Installation; Overview Of The Interfaces - Siemens SINAMICS G120D Operating Instructions Manual

Distributed converter, control units with encoder evaluation
Hide thumbs Also See for SINAMICS G120D:
Table of Contents

Advertisement

Installation

4.2 Electrical Installation

4.2
Electrical Installation
4.2.1

Overview of the interfaces

Intefaces of the converter
Image 4-4
34
Digital inputs 0 ... 5 with status LED
Fieldbus IN and OUT (PROFINET or PROFIBUS)
24 V DC supply IN and OUT
Optical interface for operator panel IOP handheld
Converter status LED
USB PC connection, address and bus termination
switch for PROFIBUS
Digital outputs 0 and 1 with status LED
Interfaces on the converter variants
HTL Encoder connection
Analog inputs 0 and 1
Slot for a memory card at rear of the
Control Unit
PROFINET status LED
PE grounding terminal
Mains supply connection
Motor, brake and temperature sensor
connections
Operating Instructions, 07/2016, FW V4.7 SP6, A5E34262100B AD
Converter with control units CU240D-2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cu240d-2

Table of Contents