Polaris RANGER 500 2018 Service Manual page 94

Hide thumbs Also See for RANGER 500 2018:
Table of Contents

Advertisement

ENGINE / COOLING SYSTEM
HOLE
YEAR
2015-18
2016-18
2016–18
5
2015-18
i.e. 2015 RZR 900 uses the holes marked with a
7. In sequence, torque the (8) engine coupler bracket
fasteners to specification.
TORQUE
Rear Engine Coupler Fastener (In Sequence):
In Sequence:55 ft-lb (75 Nm)
8. In a criss-cross pattern, torque the (4) front engine
mount fasteners to specification.
TORQUE
Front Engine Mount Fasteners:
40 ft-lbs (54 Nm)
3.16
VEHICLE DESCRIPTION
RZR 900
RZR 1000
ACE 900
RANGER Diesel
4
9. Torque the two front center isolator bolts (Item 4) to
specification.
TORQUE
Isolator Center Bolt:
40 ft-lbs (54 Nm)
10. Remove the lifting straps and overhead or portable
engine hoist and remove the support previously
installed under the transmission case during the
engine removal process.
11. Reposition the head pipe assembly in the chassis
and install new muffler and head pipe seals (Item 5).
Install the (3) head pipe bolts (Item 6) and torque to
specification.
TORQUE
Exhaust Head Pipe Bolts:
18 ft-lbs (25 Nm)
12. Install the (2) springs (Item 7) securing the muffler to
the head pipe.
13. Install the (3) coolant hoses onto the engine.
9928485 R01 - 2017-2018 RANGER 500 / 570 Service Manual
© Copyright Polaris Industries Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ranger 570 2017Ranger 500 2017Ranger 570 2018

Table of Contents