7.2.4.
IOP - Visual Checks
The top cover of IOP cabinet is removed and check that all internal cables are
terminated at their proper positions. It is also ensured that the connectors
are tight and are latched properly.
Visual check is made of glass fuse and ensure that it is mounted in fuse
holder near shell connector of IOP. The rating of fuse should be 6.3 amps.
The packing material (paper) inserted in the cartridge drive for protection
during transportation is removed and it is ensured that there is no damage to
drives and front panel. The front view and rear view of IOP-VH are shown in
Fig. 7.1 (a) and 7.1 (b) respectively.
7.2.5.
IOP - CABLING
IOP basically requires four types of cables to be connected. They are `IOP -
Power Cable', 'IOP - Terminal Cable', 'IOP - Printer Cable' and IOP-HDLC
link cables. Details on these cables are given in chapter 10, sec 10.5.23,
10.6.5, 10.6.6, 10.6.1 and 10.6.2 respectively.
7.3.

MM-ADP INSTALLATION

The ADP is placed on a table in the OMC room. It is to be ensured that the rear
panel of the unit has enough clearance from the wall so that power and signal
cables can be easily terminated on the rear panel.
7.3.1.
Material and Tools Required
• Alarm Display Panel
• Table for the Alarm Display Panel
7.3.2.
Unpacking - MM-ADP
The panel is taken out of the wooden casing by removing the front cover.
7.3.3.
MM-ADP - Visual Checks
After unpacking of the unit it is carefully examined for any breakage in the
acrylic sheet and LEDs. Check that all the keys mounted on the front panel
of ADP are not damaged i.e. permanently jammed or broken. The RESET and
ON/OFF switch mounted at the rear of the ADP are also checked for proper
functioning. The front view and rear view of MM ADP are shown in Fig. 7.2
(a) and 7.2 (b) respectively.
INSTALLATION MANUAL
IOP & ADP INSTALLATION
79