C-DOT DSS MAX-XL Installation Manual page 379

Table of Contents

Advertisement

Changes to done in EPC DTS066/T-S04. Two layer card strap list for NSC clock
driving
Mount IC 26LS31 (2 Nos. ) on U104 and U113 with Pin no.1 towards the connector.
Do the following straps.
S1
Connect
S2
Connect
S3
Connect
S4
Connect
S5
Connect
S6
Connect
S7
Connect
S8
Connect
S9
Connect
S10
Connect
S11
Connect
INSTALLATION MANUAL
AC10 to U113/1
U113/1 to U104/1
U113/2 to Ba19
U113/3 to Bc19
U104/2 to Ba20
U104/3 to Bc20
U113/16 to U104/16
U104/16 to Ba32
U104/15 to U104/9
U104/9 to U104/8
U194/8 to U104/7
PROCEDURE FOR NETWORK SYNCHRONIZATION
S12
Connect
S13
Connect
S14
Connect
S15
Connect
S16
Connect
S17
Connect
S18
Connect
S19
Connect
S20
Connect
S21
Connect
U104/7 to U113/15
U113/15 to U113/9
U113/9 to U113/8
U113/8 to U113/7
U113/7 to Aa1&Ac1
U104/12 to U113/12
U113/12 to U29/6
U104/4 to RN6/2 & Bc32
RN62 to U113/4
U113/4 to U12/1
379

Advertisement

Table of Contents
loading

Related Products for C-DOT DSS MAX-XL

Table of Contents