Chapter 5.
5.2.3.
For Levelling & Mounting the Cabinet on Basemount
S.NO.
1.
Levelling rod 6 (MPM-AXCB2104-301)
2
Double End Spanner 24 & 25 (for M18 bolt)
3.
Liner 4, MPI-WKSTZ138-401
4.
Liner 5, MPI-WKSTZ139-401
5.
Liner 6, MPI-WKSTZ140-401
6.
Spirit Level
5.2.4.
For Ganging the Cabinets (Two)
S.NO.
1.
5mm Allen Key (for M6 Socket Head
Screw)
2.
Double End Spanner 12 & 13 (for M18 bolt)
3.
Screw Drivers for M4 CSK and M8 CH
Head Screws
4.
Ganging Panel
(MPM-AXCBZ098-201)
5.
Ganging Member (Right)
(MPM-AXCBZ094-401)
6.
Ganging Member (Left)
(MPM-AXCBZ095-401)
7.
Ganging Bracket-2
(MPM-AXCBZ097-401)
8.
Ganging Bracket – 1
(MPM-AXCBZ096-401)
9.
CSK Head Screws M8.0 x 20.0
10.
CHHD Screw M4.0 x 16.0
11.
CSK Head Screw M4 x 10.0
5.3.

UNPACKING CABINET

The first step involves taking out the cabinet from the packing case. A typical
reusable packing case for a single cabinet is shown in Fig. 5.1. Using double end
spanner size 17 & 18, all nuts/bolts are removed from the top and side panel of the
packing case. Semi-unpacked cabinet is shown in Fig. 5.2.
54
DESCRIPTION
DESCRIPTION
QUANTITY
1
3
3
3
1
QUANTITY
2
1
2
1
2
2
2
2
20
15
15
C-DOT DSS MAX-XL

Advertisement

Table of Contents
loading

Related Products for C-DOT DSS MAX-XL

Table of Contents