18.3. AM TESTING

18.3.1.
AP Downloading
Set up
IOP-0 INS-ACT (inservice active).
Connect VDU Terminals on AP-0 and AP-1 through BP terminal cable
(Refer section 10.6.4 for details on BP terminal cable).
HPU is fully equipped but power is OFF.
ADP is connected.
1. Switch on ADP and perform self Tests on ADP.
2. Switch on all four PSUs in HPU and check that LEDs of all PSUs are
3. Ensure that power-on tests for AP-0 and AP-1 are successfully
4. Give reset on AP-1 and make sure that AP-0 has started the code
5. Wait for some time so that few blocks of code are loaded i.e. 0K, 36K,
6. Press reset on AP-0, link between AP-0 (--) IOP-0 is broken. AP-1
7. Wait for some time so that a few blocks of code are loaded through AP-
8. Now give a reset to AP-1 and check that AP-0 has taken over code
9. When AM comes up, check the status of all units of AM. They should
10. Bring IOP-0 in warm state and make IOP-1 INS-ACT.
11. Repeat steps 2 to 10 with second IOP-1.
If all the above test cases pass then AP-IOP links fully tested.
INSTALLATION MANUAL
glowing.
completed.
loading with both the ports enabled. Message P0-1E will come on AP-0
terminal.
72K. Hence AP-0 (--) IOP-0 link is tested.
should take over code loading with both memories enabled. Message
will come as P0-1E on AP-1 terminal.
1, therefore AP-1 (-- ) IOP-0 link is also OK.
loading and wait for the AM to come up.
be inservice. There should be critical alarms for CM and IOP on ADP.
All units of AM are AP-0, AP-1, MU-0, MU-1 & ADC. (Assume that
BMs are not equipped).