C-DOT DSS MAX-XL Installation Manual page 290

Table of Contents

Advertisement

Chapter 10.
10.7.6.
Detail of ISDN Subscriber Cable for TU/1, TU2/3
CDOT ASSY NO.
DRAWING NO.
CABLE PART NO.
CABLE MARKER NO.
CABLE DESCRIPTION
CABLE LENGTH(site dependent)
SOURCE TERMINATION PART NO.
DESTINATION TERMINATION PART
NO.
SOURCE
PLACEMENT TAB NO. RETAINED
DESTINATION
PLACEMENT
TAB NO. RETAINED
CONNECTIVITY CONDUCTOR
ALIGNMENT
ASSEMBLY PROCEDURE
Note :
1.
2.
290
X/P/Q/R/S/T : BM Number/Cabinet Number/Card Frame No./slot
No./Connector No./position on Connector
NN denotes the BM, it takes values from 1 to 32.
:
ACB-ISTUBNNN-000
:
FIG. 10.67 (c) & 10.67 (d)
:
MCA-ICSBZ011-401
:
BXXX/NN
:
64 Pair (+2 spare pair), cable arranged in a 8
units of 8 pair each, each cable unit having a
distinct coloured sleeve.
:
Site dependent
:
MCC-BPCSZ011-401
MCC-BPCSZ012-401
MCC-BPCSZ013-401
:
NA (done on site)
:
As per Table 10.44
:
Module 1 : 1
Module 2 : 2
:
As per Table 10.44
:
:-
:
Tool Type Dupont RC-216
Refer Fig. 10.67 (b)
C-DOT DSS MAX-XL

Advertisement

Table of Contents
loading

Related Products for C-DOT DSS MAX-XL

Table of Contents