Chapter 18. Functional Testing; Introduction; Software Installation - C-DOT DSS MAX-XL Installation Manual

Table of Contents

Advertisement

18.1. INTRODUCTION

This chapter gives the functional testing procedure of the CDOT MAX-XL system.
This procedure is to be followed once installation and power-on have been completed
as per Chapters 1 to 17 of this manual. The detailed testing of MAX-XL is done in
the following order.
Software Installation on IOP
Administrative Module (AM) Testing
Space Switch Controller Unit (SCU) Testing
Bus Termination Unit (BTU) Testing
Space Switch Unit (SSU) Testing
BM Testing through CM
System Initialisation in Different Configurations
Inter BM Testing
Alarm Testing
System Stability
Load Testing

18.2. SOFTWARE INSTALLATION

This section describes the software installation on CDOT IOP i.e. copying exchange
software on to IOP disks.
Before starting the software installation make sure that all the diagnostic
commands which are mentioned in Acceptance Testing manual are running
properly. Now load the exchange software by strictly following the software
installation procedure which is explained in DSS MAX EXCHANGE OPERATIONS
Manual.
INSTALLATION MANUAL
Chapter 18.
Functional Testing
348

Advertisement

Table of Contents
loading

Related Products for C-DOT DSS MAX-XL

Table of Contents