C-DOT DSS MAX-XL Installation Manual page 278

Table of Contents

Advertisement

Chapter 10.
10.7.2.
Detail of EMF Trunk Cable in TU1
CDOT ASSY NO.
DRAWING NO.
CABLE PART NO.
CABLE MARKER NO.
CABLE DESCRIPTION
CABLE LENGTH
SOURCE TERMINATION PART NO.
DESTINATION TERMINATION PART
NO.
SOURCE PLACEMENT
TAB NO. RETAINED
DESTINATION PLACEMENT
TAB NO. RETAINED
ASSEMBLY PROCEDURE
Note :
1.
2.
3.
278
XX can takes values from 1 to 16.
Fig. 10.64 (a) & 10.65 (a) are for EMF cables in TU1.
NN denotes the BM number, it takes value from 1 to 32.
:
ACB-MAXXAEXX-000
:
FIG 10.64 (a) & 10.65 (a),
:
MCA-ICSBZ009-401
:
AEXX/NN
:
24 Pair cable arranged in 3 units of 8 pair each,
cable unit having a distinct coloured sleeve
(1 pair is spare).
:
Site dependent.
:
MCC-BPCSZ006-301
(32X2 IDC contact block assy)
MCC-BPCSZ005-301 (Piercing block)
MCC-BPCSZ007-301 (Universal cover)
MCS-PHSTT002-401 (Screw tapping 2x9.5)
:
MDF
:
BM (TU01)
:
1 to 4
:
MDF Termination block
:
-
:
Tool Type Dupont RC-216
Refer FIG 10.64 (a) & FIG. 10.65 (a)
C-DOT DSS MAX-XL

Advertisement

Table of Contents
loading

Related Products for C-DOT DSS MAX-XL

Table of Contents