Finally all units of AM and CM should be inservice.

18.6. SCU DIAGNOSTICS

18.6.1.
SSC Diagnostics
Set up
IOP-0 is INS-ACT
AM, CM completely initialised and all units are inservice
1.
2.
3.
4.
352
Give a reset to SSC-1 again, SSC-0 will take over code loading and
wait for complete code loading and SCU to come up.
Check the status of all units of SCU. All units of CM are SSC-0, SSC-1,
CMS1, CMS2, CMS3, CMS4, SS-0, SS-1, SSBID-0, SSBID-1,
NSC/CLK-0, NSC/CLK-1, MU-0, MU-1. Let SSC-0 be active and SSC-1
standby.
Make CMS2 OOS-OPR
Give soft start to CM, CM should come up through only available
CMS1.
Bring CMS2 inservice
Make CMS1 OOS-OPR
Give soft start to CM, CM should come up through only available
CMS2.
Bring CMS1 inservice
Interchange SSC
Repeat step 11 to 16
Interchange AP
Repeat step 3 to 18
Make SSC-0 OOS-OPR, SSC-1 INS-ACT
Give a command DGN-SWU for SSC-0. If diagnostics are okayed then
bring SSC-0 inservice by PUT-SWU-INS command. If diagnostics are
failed take appropriate action and give diagnostics again.
Interchange SSCs
Repeat step 1 to 3 for SSC-1.