18.11. SUM AND ISTU TESTING

18.11.1.
SUM Testing
Set up :
IOP-0 is INS-ACT
AM/CM/BM is initialized
SUM should be in principal TU only and if SUM is in BM-1, BM-2 should
not be RSU.
TSU-TU cable terminations are same as normal TU.
Refer section 16:3:16 for jumper settings in SUM and set the jumpers
accordingly.
BME jumper settings are to be depending upon the CPU used (BPC/HPC)
Refer page 10-212 to 10-215 for card slot details, power connections and
error signals.
Equip-frame as SU using equip-frame command
Connect VDU terminals on SU7-0 and SU7-1 controllers through BP
terminal cable for SUM
Switch on the power supplies and ensure the power on tests for SU7-0 and
SU7-1 are completed successfully
Equip the PHC cards using equip-trml-card command and bring the TUC
cards in-service
Wait for some time so that code loading will start
After code code load RUN DGN on SU7-0 and SU7-1 and MU-1 using
standard procedure. IF DGN fails take appropriate action, give DGN
again. Finally, all the controller in SUM should be in-service and
interchange of SU7 should be smooth.
Tst-Trm : S02 should be conducted for all the PHC cards
Note :
i)
ii)
INSTALLATION MANUAL
18.
Bring IOPs in Duplex by following the procedure explained in
C-DOT DSS IOP-VH user manual.
Atleast one PHC card should be equipped for code-loading to take
place.
For all the SUM related commands the module should be specified as
SUM only.
FUNCTIONAL TESTING