INSTALLATION INSTRUCTIONS
B.2
Installation Checklist
This checklist only covers the most basic, standard system installation. Depending on the
system configuration or specific customer requirements, this list may or may not apply.
Follow these basic steps to install and configure your new SeaBat sonar system:
Install the wet-end components:
Install and connect cables:
Power up the system
Test the system
For information on system configuration and operation, refer to the RESON Sonar UI User
Manual (see Appendix E Reference Documentation).
SeaBat T-Series Subsea Operator's Manual
Version 7
Transducer arrays
o
SSP
o
Projector to SSP cable(s)
o
Receiver to SSP cable(s)
o
Auxiliary sensor cables
o
SSP to UUV cable
o
NOTE
Page 95
January 31, 2019