Installing The Chassis Intrusion Detection Switch; 15. Connect The Power Cords - HPE ProLiant DL20 Gen10 Plus User Manual

Table of Contents

Advertisement

Installing the chassis intrusion detection switch

Installing the chassis intrusion detection switch
Procedure
Procedure
1. If physically powering down a server with the front bezel installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel .
8. Disconnect following cables from the system board:
14-pin power supply cable
Drive Mini-SAS cable, power Y-cable, and sideband-SATA fan-out cable
9. Connect the chassis intrusion detection switch cable .
10. Install the chassis intrusion detection switch:
a. Insert the alignment pins on the DIMM guard through the holes on the switch (callout 1).
b. Route the rest of cable on the DIMM guard (callout 2).
11. Reconnect all following cables to system board:
14-pin power supply cable
Drive Mini-SAS cable, power Y-cable, and sideband-SATA fan-out cable
12. Install the access panel .
13. Install the server into the rack .
14. Connect all peripheral cables to the server.

15. Connect the power cords:

Installing the chassis intrusion detection switch
147

Advertisement

Table of Contents
loading

Table of Contents