a. Slide the drive cage into the media bay (callout 1).
b. Secure the drive cage with the screws removed in step 8-a (callout 2).
10. Connect the drive cables .
11. Install the access panel .
12. Install the server into the rack .
13. Connect all peripheral cables to the server.
14. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
15. Power up the server .
16. Install the drives .
17. If removed, install the front bezel .
This installation is complete.
Installing the two-bay SFF drive cage option