HPE ProLiant DL20 Gen10 Plus User Manual page 84

Table of Contents

Advertisement

11. Immediately slide the power supply into the bay until it clicks into place.
12. Make sure the -48 V DC power source is off or the PDU breaker is in the off position, and then connect the power cord to the -
48 V DC power source or PDU.
13. Turn on the -48 V power source or switch the PDU breaker to the on position to supply -48 V to the power supply.
14. Make sure that the power supply LED is green.
The installation is complete.
Installing a DC power supply
84

Advertisement

Table of Contents
loading

Table of Contents