HPE ProLiant DL20 Gen10 Plus User Manual page 40

Table of Contents

Advertisement

b. Loosen the shipping screws (callout 2).
c. Slide the server out of the rack until the rail-release latches are engaged (callout 3).
6. Remove the server from the rack:
a. Press and hold the protruding surface of the server rail-release latches (callout 1).
b. Pull the server from the rack (callout 2).
7. Place the server on a flat, level work surface.
Remove the server from the rack
40

Advertisement

Table of Contents
loading

Table of Contents