Installing the chassis intrusion detection switch

Installing the chassis intrusion detection switch
Procedure
Procedure
1. If installed, remove the front bezel .
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Remove the access panel .
7. Install the chassis intrusion detection switch on the DIMM guard and connect the cable to the system board .
8. Install the access panel .
9. Install the server into the rack .
10. Connect all peripheral cables to the server.
11. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
12. Power up the server .
13. If removed, install the front bezel .
The installation is complete.