HPE ProLiant DL20 Gen10 Plus User Manual page 141

Table of Contents

Advertisement

15. Install the riser cage.
16. Connect the M.2 SSD SATA cables .
17. Install the access panel .
18. Install the server into the rack .
19. Connect all peripheral cables to the server.
20. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
21. Power up the server .
22. If removed, install the front bezel .
23. To configure the M.2 SSDs, see the OS-specific Intel VROC guide.
This installation is complete.
Installing the M.2 SATA SSD enablement option
141

Advertisement

Table of Contents
loading

Table of Contents