For a server that has quick-release chassis ears , open the latches (callout 1), and then tighten the shipping screws (callout 2).
5. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
6. Power up the server .
This installation is complete.
Installing the rack rail hook-and-loop strap
71