VERSION 02/2018
OPERATING MANUAL
7.4.2 STARTING THE SYSTEM
Zerstäuberluft
Mat. Druckregler
Pumpe
Atomizing air
Mat. pressure reg.
Pump
11
10
9
Control unit, VM 5020W
1. Set the main switch (1) to position 1.
During the start-up phase, the device automatically performs an internal function
test and then automatically switches to recipe 1 (15).
2. Set the desired recipe.
See Chapter
7.4.7
and the following for information on how to operate the control unit.
Product supply
3. Open the compressed air supply.
4. Set pump pressure regulator (9) depending upon the paint viscosity
(see operating manual of the product pressure generator).
– DD10 pump: approx. 0.2–0.6 MPa; 2–6 bar; 30–90 psi
– DD10-/ZIP52 pump with product pressure regulator: approx. 0.3–0.6 MPa; 3–6 bar;
40–90 psi
5. DD10-/ZIP52 pump with product pressure regulator:
Set product pressure regulator (10) to approx. 0.05–0.2 MPa; 0.5–2 bar; 7–30 psi operating
pressure.
6. Set atomizing air regulator (11) to approx. 0.2–0.4 MPa; 2–4 bar; 30–60 psi.
Spray gun
7. Spray on a test object (pull trigger).
If the trigger is now actuated at the spray gun, the high voltage is switched on and
both displays (21) and (22) change from dot to bar display, i.e. the actual value of
the high voltage (21) and the actual value of the spray current (22) are displayed.
The high voltage can be switched on and off with the push button (3).
- DD10 pump:
8.
Adjust the pump pressure regulator (9) and atomizing air (11) with respect to the
nozzle and object.
- DD10-/ZIP52 pump with product pressure regulator:
Adjust the product pressure regulator (10) and atomizing air regulator (11) in
accordance with the nozzle and object.
ORDER NUMBER DOC 2366717
15
21
22
80
100
60
80
R1
40
60
20
40
R2
10
20
kV
µA
R3
POWER
0
AquaCoat
B_03371
3
1
See Chapter 7.4.3.
1
See Chapter 7.4.3.
B_05905
56