HBM T10FS Mounting Instructions page 51

Hide thumbs Also See for T10FS:
Table of Contents

Advertisement

Binder 723
6
1
5
7
2
3
4
Top view
1)
Factory setting; complementary signals RS-422
T10FS
Assignment for connector 1
Voltage supply and frequency output signal.
Binder
Assignment
conn.
Pin
1
Torque measurement signal
(frequency output; 5 V
0 V)
2
Supply voltage 0 V;
3
Supply voltage 18 V to 30 V
4
Torque measurement signal
(frequency output; 5 V
5
Measurement signal 0 V;
symmetrical
6
Calibration signal trigger 5 V -
30 V
7
Calibration signal 0 V;
Shielding connected to housing
ground
Important
The torque flanges of option 3, code SF1/SU2 are only
intended for operation with a DC supply voltage. They
must not be connected to older HBM amplifiers with
square‐wave excitation. This could lead to the
destruction of the connection board resistances, or other
errors in the measuring amplifiers (the torque flange, on
the other hand, is protected and once the proper
connections have been re‐established, is ready for
operation again).
A0785-150 HBM: public
Electrical connection
Wire
color
wh
1
;
bk
bu
rd
1
/12) V)
gy
gn
gy
Sub‐D
conn.
Pin
13
5
6
12
8
14
8
51

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T10s2T10s3T10s4T10s5T10s6

Table of Contents