Peak-Load Negotiation - W&H teon + RID-200 Operating Instructions Manual

Disinfector
Table of Contents

Advertisement

Peak load man-
agement

Peak-load negotiation

The machine is suitable for use in an energy management system. For
this purpose, it must be technically adapted and the controls reset by
the W&H Customer Service Department.
Please contact the W&H Customer Service Department for further
information.
In the event of a peak-load negotiation, some machine components
such as the heater element will be switched off for a while. The ma-
chine will remain on during this period and the current programme will
not be interrupted. If one of the components that is switched off is
needed during the current programme stage, the programme duration
will simply increase for the duration of the load negotiation.
The third line of the display will alert you to the peak-load negotiation,
for example:
Vario TD Dental
Temperature
Peak load cut-out
Electrical connection
55 °C
143

Advertisement

Table of Contents
loading

Table of Contents