Relative Humidity
Heat Flow Rate
Current measurement
accuracy
1
The max input/output current is de-rated to 12A when using the supplied NEMA
5-15P (15A) cable (p/n SLPP012310-01).
2
The max input/output current is de-rated to 16A when using the optional NEMA
5-20P (20A) cable (p/n SLPP012410-01, SLPP012510-01, SLPP012610-01).
Physical Installation
To install the SLB branch office manager in a rack:
1. Place the SLB device in a 19-inch rack.
Warning:
branch office manager. If you mount the SLB in an enclosed rack, we
recommended that the rack have a ventilation fan to provide adequate
airflow through the SLB.
2. Connect the serial device(s) to the SLB device ports. See on page 25.
3. Install any PC Cards you intend to use. If you install a modem card, connect to the
phone line. See
4. You have the following options:
a) To configure the SLB branch office manager using the network, or to monitor
b) To configure the SLB branch office manager using a dumb terminal or a
5. Connect the power cord, and apply power. See
page
6. Wait approximately a minute and a half for the boot process to complete.
When the boot process ends, the SLB host name and the clock appear on the LCD
display.
Now you are ready to configure the network settings as described in
SLB™ Branch Office Manager User Guide
Operating: 10% to 90% non-condensing
Storage: 10% to 90% non-condensing
68 BTU per hour
± 12%
Be careful not to block the air vents on the sides of the SLB
9: PC
Cards.
serial devices on the network, connect at least one SLB network port to a
network. See
Connecting to a Network Port
computer with terminal emulation, connect the terminal or PC to the SLB
console port. See
Connecting a Terminal
26
.
on page 25.
on page 25.
Connecting to a Power Source
4: Quick
3: Installation
on
Setup.
24
Need help?
Do you have a question about the SLB088411-01 and is the answer not in the manual?