Fig.: 3 - 15
Legend of fig. 3 - 15:
Item Designation
1
Bonding areas
2
3
Fig.: 3 - 16
Legend of fig. 3 - 16:
Item Designation
1
Position of top segment
2
Position of side wall segments
3
Position of bottom segments
EN
Infusomat® Space 6.0
2. In order to retrofit the top housing section, clean the bonding
3. Position the bonding segments in the battery compartment
4. Bond in the segments (5x) in the positions shown.
5. After bonding, press on the segments in order to avoid bub-
1
2
3
Disassembly / Assembly
areas
(Fig.: 3 - 15 / Item
1) with isopropanol and let them air.
using a scalpel.
bling.
3
3 - 17