Braun Infusomat Space Service Manual page 48

Infusion pump
Hide thumbs Also See for Infusomat Space:
Table of Contents

Advertisement

3
Disassembly / Assembly
Fig.: 3 - 1
3 - 2
Preparations for Exchanging the Processor PCB
If the processor PCB is to be replaced, a back-up of the pump set-
tings is to be carried out, if this is still possible.
Note
Please note that text and / or functions of the Service Program
may change depending on the software version. The following
screenshots are only examples and represent the state when the
manual was printed.
1. Start the Service Program
➨ pg. 1 -
10).
2. Select the tab "Modification data".
3. Press the „From device" button. The data are read from the
device and shown on the display.
(see „Starting the Service Program"
Infusomat® Space 6.0
EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents