16.
Start the engine and engage the hydraulic system (P
Wait for the air pressure to reach 70 psi before engaging the pump.
Caution
Make sure the ball valve on the suction line is fully open before starting the vehicle.
17.
On the packer control station, press the yellow P
its home position (see Figure 3-38).
Figure 3-38
Packer Retract button
18.
Extend and retract the packer in E
properly installed.
To activate this mode, press and hold the A
(see Figure 3-39).
Figure 3-39
Auto-eject switch
switch set to "ON").
UMP
R
ACKER
ETRACT
mode for a full cycle to make sure the packer has been
JECT
-E
switch on the in-cab control panel
UTO
JECT
General Maintenance 57
button to retract the packer to
Need help?
Do you have a question about the AUTOMIZER FULL EJECT and is the answer not in the manual?
Questions and answers