Download Print this page

Mitsubishi Electric PURY-M200YNW-A1 Service Handbook page 360

Hide thumbs Also See for PURY-M200YNW-A1:

Advertisement

[8-13 Parts Replacement Instructions (Outdoor Unit) ]
(21) Re-place the LEV4 assembly that was removed in step (11) as it was. (3 areas to be brazed. See Figure 21.)
Area to be
brazed
A
(22) Re-place the components that were removed as they were. This step completes the check valve block assembly
replacement procedure.
BS_08_L
Area to be brazed
Injection pipe
LEV4
Rubber spacer
Replace the pipe that
was cut in step (12)
with the pipe included
45°
with the check valve
block assembly.
Figure 21
Area to be brazed
Injection pipe
LEV4
Area to be
brazed
A
Braze with the rubber
spacer attached.
93
chapter 8 -

Hide quick links:

Advertisement

loading