6.
Daily Instrument Setup
6.1
Station overview
Fig. 50
1
Load drawer
2
Unload drawer
3
Coverglass cartridge
4
Pick&Place module
Warning
•
The system does not monitor the fill level of the reagent vessels in the load drawer (→ Fig. 50-1).
The user is responsible for monitoring.
• Before the daily instrument setup, ensure that the covers of the reagent vessels in the load drawer
were removed and the drawer inserts are correctly inserted in the unload drawer (→ Fig. 8-1).
HistoCore SPECTRA CV
6
7
3
4
5
Daily Instrument Setup
1
2
5
Waste tray
6
Left coverslip line
7
Right coverslip line
L1
L2
6
75