6
Daily Instrument Setup
6.2
Switching on and shutting down the instrument
Switching on the instrument
1. To start the instrument, press the
2. During initialization, a verification of all modules and consumables is carried out automatically.
The
Operating switch
start.
L After completing the initialization phase, the main menu
and the user is informed
Acknowledge the messages by pressing
(→ P. 118 – 7.3 Preparing the hose system for priming and
Fig. 51
Shutting down the instrument
1. To switch the instrument into standby mode (e.g. overnight), press the
then illuminates in red (→ Fig. 52-1).
L For cleaning and maintenance, observe the notes in
cleaning this
76
Operating switch
(→ Fig. 52-1)
is illuminated in green whenever the instrument is ready to
(→ Fig. 51)
1
Fig. 52
instrument).
(→ Fig. 52-1)
(→ Fig. 19)
that a
Quick Prime
is required for the coverslip line in use.
Ok
(→ Fig. 51-1)
and follow the instructions that follow
cleaning).
1
(→ P. 105 – 7.1 Important notes about
illuminated in red.
appears on the screen.
1
Operating switch
Version 2.1, Revision K
twice. It