Chapter 2 — Performance Verification
2-1
Introduction
This chapter contains tests that are used to verify the performance of Spectrum Master Models MS2723B and
MS2724B.
Section 2-2 "Spectrum Analyzer Function Verification"
begins the instructions to verify Spectrum
Analyzer functions, and
Section 2-3 "Optional Functions Verification" on page 2-33
begins the instructions to
verify Options. Blank performance verification test records are provided in
Appendix
A. Make a copy of the
blank test records and use them to record measured values.
Caution
Verify that all equipment has warmed up for at least 30 minutes before making any measurements.
Models MS2723B and MS2724B MM
PN: 10580-00165 Rev. D
2-1