8
Maintenance
Replace the Multi-Channel Gradient Valve (MCGV)
Replace the Multi-Channel Gradient Valve
(MCGV)
Tools required
p/n
0100-1710
8710-0899
Parts required
p/n
G1311-67701
Preparations
•
•
•
For best performance and life time, use lower channels A and D for aqueous
NOTE
solvents in buffer applications.
1
Use the mounting tool for removing tubing connections
between the degassing unit and the MCGV.
1260 Infinity II Flexible Pump User Manual
Description
Mounting Tool for Tubing Connections
Screwdriver Pozidrive Shaft
Description
Multi channel gradient valve (MCGV)
Switch off pump at the main power switch
Open the doors
Use an optional solvent shutoff valve or lift up solvent filters inside solvent bottles for avoiding
leakages
2
Remove the inlet weaver, see
Weaver"
on page 161.
"Replace the Inlet
170