(6) Operation conditions
Ambient temperature
Ambient humidity
(7) Maintenance space
When analyzer is installed by itself, please make sure to
keep the space shown in the dimension of the figure for
maintenance. In case analyzer is installed as an unit, please
refer to the instruction manual of the analyzer unit.
(8) A breaker that meets IEC60947-1 and IEC60947-3 should
be included in the installation.
(9) A breaker should be installed near the analyzer where an op-
erator can access it.
(10) A label that clearly identifi es the breaker should be placed
on it.
(11) The breaker rating should meet the analyzer rating max 2A
and a breaker should conform to all necessary approvals.

3.2 Installation

3.2.1 Installation of analyzer main frame

Installation methods for the analyzer main unit is shown below.
Type
External dimensions
19-inch rack
mounting
"A" : 57.2 (EIA)
Note) • The analyzer weight must be supported at the bottom of the casing.
• The analyzer should be installed in a place where ambient temperature is within -5 to 45°C (max.
40°C when two optical units are used, and the power supply is more than 200V AC), and tem-
perature fl uctuation during using is minimum.
• Where vibration is unavoidable, protect the analyzer from vibrating.
For example, install rubber material around the case to isolate vibration from the suppot structure.
: -5° to 45°C (max. 40°C when
two optical units are used, and the
power supply is more than 200V
AC)
: 90 % RH or less, no condensation
435
463
483
6
Mounting dimensions
M6
450 or more
465
unit : mm
analyzer
(installed)
analyzer
(Remove
the cover)
500
(Unit : mm)
Mounting method
Support
INZ-TN2ZPA-E