Komatsu D61EXi-24 Operation & Maintenance Manual page 93

Bulldozer
Hide thumbs Also See for D61EXi-24:
Table of Contents

Advertisement

HANDLE CONTROL BOX
1.
Press power supply ON switch (green) (1) to turn on the
power supply of the control box.
2.
Insert USB memory (2) in which control point files are
saved into USB port (3) of the control box.
3.
On the main window, press "iB logo key" and display the
main menu.
4.
On "File" menu, press "Control..." and select.
5.
On "Control points" screen, press "Import...".
6.
On "Import Project Data" screen, select "What:" and
"Where:".
As "What:", select the "Control point files (GC3)" or "Con-
trol data from project file (TP3)".
As "Where:", select the place where the control point file is
saved.
7.
Select the name of the file to be imported, and press "Ok".
FILE MENU
AJD02566
AJD02567
AJD02568
4-13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D61pxi-24

Table of Contents