Method For Using Automatic Blade Control - Komatsu D61EXi-24 Operation & Maintenance Manual

Bulldozer
Hide thumbs Also See for D61EXi-24:
Table of Contents

Advertisement

MACHINE OPERATIONS AND CONTROLS
6.
Turn the starting switch to OFF position (A).
The engine will stop.
7.
Remove the starting switch key.

METHOD FOR USING AUTOMATIC BLADE CONTROL

PREPARATIONS FOR BLADE AUTOMATIC CONTROL
Before starting the blade automatic control, prepare or set the following.
Preparations in conformity to each site condition
Set base station
Method for configuring radios
Project file setting
Input pitching rod length
Method for inputting wear amount of blade edge and track shoe
Set base point for checking blade elevation
Checks before starting
Reset cylinder stroke end
Check blade elevation, adjust
Select active file
PREPARATIONS IN CONFORMITY TO EACH SITE CONDITION
SET BASE STATION
The base station communicates with the machine by using ra-
dio.
For the setting place of the base station, select such place that
there is no obstacle between the base station and jobsite so
that the radio signal can reach.
Also select setting place where has already been measured
and its coordinate has been determined.
For the usable base station, consult your Komatsu distributor in
advance.
For details of handling the base station, see the instruction
manual of the base station.
METHOD FOR CONFIGURING RADIOS
Set the radio of the control box matching with the specifications of GNSS radio device and the radio setting of
the base station.
Resetting is not necessary unless the settings of GNSS radio device and the base station are changed.
REMARK
Install GNSS radio device suitable for the radio specification of the base station.
For the usable GNSS radio device, consult your Komatsu distributor in advance.
1.
Set the base station and turn on the power supply.
3-20
OPERATION

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D61pxi-24

Table of Contents