Komatsu D61EXi-24 Operation & Maintenance Manual page 59

Bulldozer
Hide thumbs Also See for D61EXi-24:
Table of Contents

Advertisement

OPERATION
REMARK
If some place higher than the design surface is left at 1 time dozing, travel on that place several times so
that such place can be built as designed.
If the soil in front of the blade disappears and no load to the blade in the middle of carrying the soil, drive
the machine in reverse once and get the load to the blade again.
When the design surface is deep, offset the design surface upward and cut the ground by each 150 to
300 mm in steps, you can operate smoother and more stable.
METHOD FOR SCRAPING SOILS IN SHORT DISTANCE
In this method, carrying distance is short and operation is efficient.
Enable "Smooth Start" and select "Cutting".
1.
Start dozing by the blade automatic control from the position near piling position (U).
2.
Gradually retract the starting point of dozing and repeat traveling backward and forward.
(T) Design surface
MACHINE OPERATIONS AND CONTROLS
3-45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D61pxi-24

Table of Contents